Order for Professional Services No. T4224 Design Services for Contract Nos. T200.737 Guide Rail Improvements, Milepost 98 to 104 and T200.738, Guide Rail Improvements, Milepost 94 to 98
Deadline needs confirmation. Check the official notice before relying on this date.
September 17, 2026 Open Order for Professional Services No. T4224 Design Services for Contract Nos. T200.737 Guide Rail Improvements, Milepost 98 to 104 and T200.738, Guide Rail Improvements, Milepost 94 to 98 Engineering Professional Services
Open the official source and follow the solicitation instructions. Confirm due dates and submission method before committing estimating time.
| Type | Professional Services |
| Notice subtype | Professional Services |
| Contract / reference | T4224 |
| Source | NJ Turnpike Authority |
| Location | County not stated in notice |
| Normalized deadline | Thu, Sep 17, 2026 (time not published) - agency currently lists this opportunity as Open; verify the closing date |
| Source deadline text | September 17, 2026 |
| Last checked | 2026-09-18 |
| Access | Public access |
| Platform | NJTA procurement portal |
NJTA: verify the applicable qualification
Consultant PSPQ validity depends on the financial statements: up to 24 months with audited or CPA-reviewed statements, or 12 months with compiled or internally prepared statements. Confirm current approval and the EOI's required profile codes; do not assume every approval lasts two years.
Agency preparation guidance, not a complete submission checklist. This project's solicitation and addenda control.
The Turnpike Authority publishes its own qualification, portal, specification, and drawing resources for Turnpike and Garden State Parkway work. Confirm the applicable process in the solicitation.