Construction Management/Construction Inspection Services for I-78 Toll Bridge Main River Bridges Cleaning and Painting
Published dates or the agency status conflict. Confirm the current deadline and addenda. Verify with the issuing agency.
Deadline needs confirmation. Check the official notice before relying on this date.
The latest linked document needs a deadline review.
Agency schedule
Addenda may change submission requirements or dates. The schedule below comes from the agency listing; addendum contents are not automatically reconciled.
Pre-proposal meeting: Tue, Aug 18, 2026 at 2:00 PM ET (time zone assumed)
Published date has passed.
Agency schedule
Question deadline: Thu, Aug 27, 2026 (time not published)
Published date has passed.
Agency schedule
Confirm amendments and attendance requirements in the official documents. These dates are separate from the proposal deadline.
Professional engineering services for Construction Management / Inspection Services for the I-78 Toll Bridge Main River Bridges Cleaning and Painting in Northampton County, PA and Warren County, NJ.
Open the official source and follow the solicitation instructions. Confirm due dates and submission method before committing estimating time.
| Type | Professional Services |
| Notice subtype | Professional Services |
| Contract / reference | CM-552A |
| Source | DRJTBC Current Procurements |
| Location | Bi-state |
| Corridor | I-78 |
| Structure | Bridge |
| Date needs confirmation | Thu, Sep 10, 2026 at 2:00 PM ET (time zone assumed) |
| Source deadline text | September 10, 2026 2:00pm |
| Last checked | 2026-11-02 |
| Access | Public access |
| Platform | DRJTBC procurement portal |